Short answer: most re-roofs done in one to two days. A simple Calgary bungalow with one layer of asphalt and sound decking is frequently a single day, driveway to magnet sweep. A typical two-storey with an attached garage is a day and a half to two. That is the honest baseline, and the rest of this guide is about what pushes a job past it.
Homeowners ask how long a roof replacement takes because they are planning around noise, pets, parking and work-from-home calls. So here is the actual sequence, with times, and then the six things that add days.
A normal Calgary asphalt re-roof, hour by hour
Day one, 7:00 to 8:00 a.m.
Trucks and the disposal bin get positioned. We tarp the ground, cover the deck and any landscaping, move the patio furniture, and set plywood over anything that can be dented. The City of Calgary community standards bylaw restricts construction noise, so nothing loud runs before 7:00 a.m. Ladders and roof jacks go up, safety anchors get set, and the crew walks the roof to confirm what the estimate said.
Day one, 8:00 a.m. to noon
Tear-off. Shingles, underlayment, old flashings, old vents, all of it comes off in sections down to the deck. We strip in sections rather than opening the whole roof, so if the weather turns we are only exposed on one slope. This is the loudest part of the entire job. A 20 square asphalt tear-off produces roughly 4,000 to 5,000 lb of debris, which is the noise you hear hitting the bin.
Day one, noon to 2:00 p.m.
Deck inspection and repair. Now we can actually see the sheathing. Soft, delaminated or rotten sheets get cut out and replaced, protruding nails get dealt with, and any framing issue gets photographed and shown to you before it gets covered. Then drip edge at the eaves, ice and water shield at the eaves and in the valleys, and synthetic underlayment over the field.
Day one, 2:00 to 6:00 p.m.
Shingles start. Starter course at the eaves, then the field courses running up the slope, with valleys and penetrations flashed as the crew reaches them. On a bungalow this is often where the roof finishes. On a two-storey, the crew usually gets one or two slopes complete and dries in the rest.
Day two
Remaining slopes, then the detail work that separates a good roof from a fast one: chimney and sidewall flashing, plumbing stack boots, new roof and ridge vents, hip and ridge cap, and sealing. Then cleanup, a full magnet sweep of the lawn, driveway, flower beds and street, eavestroughs cleared of debris, bin hauled, and a final walkthrough with photos.
That is the whole job. Two crews of five to seven people, two days, done. What we will not do is compress a two-day roof into one by skipping flashing or reusing old vents.