Why architectural asphalt is the sensible replacement
We install a lot of different systems, and for a Calgary shake conversion architectural asphalt is the answer for most homes. Not because it is the cheapest, but because of how it behaves here.
- Life expectancy in this climate. Laminated architectural shingle gives 25 to 30 years of real service in Calgary, which is the same or better than the shake it replaces, with none of the annual maintenance.
- Hail. You can step up to a Class 4 impact-resistant laminate that has passed the UL 2218 test, where a two-inch steel ball is dropped twice from twenty feet onto the same spot without cracking. In a hail city that is a functional upgrade, and many Alberta insurers give a premium discount for it.
- Fire rating. Class A assembly, which is what FireSmart asks for.
- Weight. Asphalt over a new deck is not heavier than the shake system it replaces, so you stay inside the maintenance category for permits and you are not adding dead load to a 1990s truss roof.
- Repairability. Matching a shingle in year 12 after a wind event is straightforward. Matching 27-year-old cedar is not.
Metal is a legitimate alternative if you want a 50-year system and are prepared for the price, and we do install it. For the vast majority of shake conversions in Calgary, though, the money is better spent on a good architectural shingle over a properly re-sheeted, properly ventilated deck than on a premium surface over compromises underneath.
A recent Calgary shake conversion
One of our recent jobs is the textbook version of all of this. A 1990s two-storey with the original cedar shake, 25 years old. From the ground it looked tired. From the roof it was worse: curled butts across the whole south slope, splits running past the head lap in three separate fields, and shake fragments packed into the eavestrough.
We did a full tear-off to the deck. Once the shake and the felt interlayment were off, the skip sheathing was exposed exactly as expected, so the roof got sheeted over, then synthetic underlayment, ice and water shield at the eaves and valleys, new flashings at every transition, new vents, and new architectural asphalt shingles over the whole thing. Bins staged out front, magnet sweep of the lawn and driveway at the end of each day. Most re-roofs done in one to two days, and a shake conversion with new decking runs longer than that, which we say up front rather than after the deposit. Photos of finished work are in our gallery.
Talk to us
Mountain Standard Roofing handles residential roof replacement and shake conversions across Calgary, Airdrie, Cochrane and Okotoks. If hail is part of the story, see hail damage and insurance work, where we document the damage for your adjuster and handle the claim paperwork. If the attic is part of the problem, attic insulation belongs in the same scope. If you want to compare a longer-life option, read our metal roof cost guide. Not sure the roof is finished yet? Our chinook damage guide walks through the failure signs.